West side of two hour fire separation assembly. Bathrooms and a
corridor now fill this space.
Dave puts up the second layer (!) of code-required sheetrock.
Franklin Tech wiring students run wires.
How many students does it take to run a wire?
The Franklin Tech plumbers have been busy, too.
The new 90-minute rated door to the back of the Visitors Center.
New partition, east interior wall of Childrens Art Museum
Strapped ceiling, ready for insulation
Three new windows and new door for second fire exit.
Rear of carbarn to left, wood storage trailer to right.
By the time you see this the trash will be gone!
Three new windows, new main entrance (minus landing, etc.).